How we get and check our data
CondoPulseFL compiles Florida condominium compliance records from public sources. Every status on a building page links to the record it comes from and shows the date we last checked it. We don't give buildings a numeric score.
Where the data comes from
We're starting with Miami-Dade County. We read only public sources, and only official records can set a status.
| Source | What we take from it | How often we check |
|---|---|---|
| DBPR condominium project records, DBPR cooperative records and DBPR building reporting (SB 4-D) | Each condominium and cooperative, its buildings and their addresses, and the association (DBPR calls it the “managing entity”). Buildings are added to the site only from these state records. | Every week |
| DBPR SIRS reporting database (submissions before July 2025, and July 2025 and after) | Whether a Structural Integrity Reserve Study (SIRS) was reported to the state, with its completion date where the form gives one. Older filings also give floors, units and year built. | Every week |
| Miami-Dade Property Appraiser (Property Point View) | Folio numbers, street address, number of units, year built, location, and floors where recorded. | Every month |
| Miami-Dade County building permits and building violations; City of Miami building permits and 40-year recertification | Structural repair permits (issued and closed), unsafe-structure notices, code enforcement cases, and recertifications listed as due or completed. | Every day |
| Miami-Dade County building recertification search | Buildings listed as due for recertification, and recertifications completed. | Every week |
| DBPR and Florida Board of Professional Engineers licensee files | Licenses for engineers, engineering businesses, architects, contractors, community association managers (CAMs) and CAM firms: number, type, status and dates, and contractor discipline cases. | Every month |
| Public records requests (Florida Chapter 119) to cities and the county | Milestone inspection notices and Phase 1 and Phase 2 reports, which no agency publishes building by building, and Miami Beach permits and recertifications, which the city doesn't publish as open data. | As records arrive |
Each status on a building page links to the exact record it comes from. Until a records request comes back, many milestone rows correctly show “No record found” or an Estimate. We never read the personal contact details on state forms or county portals.
What each status means
Each status is shown as words, a color and an icon, so color is never the only signal.
- Verified: an official record says so. The status links to that record and shows the date we checked it.
- Estimate: we calculated it from other records, for example the first milestone inspection year from the certificate-of-occupancy date and the local rule. It's labeled “Estimate” and shows its inputs.
- No record found: we haven't found a public record of this yet. It never means “not done”. The association or the local building department can confirm.
- Completed
- Verified. Official record of completion.
- In progress
- Verified. Official record shows it started but isn't finished.
- Due
- Verified. Official notice or published cycle list with a deadline.
- Overdue / enforcement
- Verified. Only from an official non-compliance or enforcement record.
- Not required
- Verified. Verified exemption.
- Estimated due: [year] Estimate
- Calculated. From the certificate-of-occupancy date and the jurisdiction's rule. Tap to see the inputs.
- No record found
- Neither. We haven't found a public record of this. It never means “not done.”
Nothing turns red unless an official source shows non-compliance or enforcement. A missing record, a late estimate or an old date is never shown in red.
The Compliance Snapshot
Each building page, and each search result, opens with one of three phrases: Action needed (at least one verified item is due, overdue or in progress), Up to date on record (the milestone inspection and the SIRS each have a verified record of completion or exemption) or Incomplete public records (key items are estimates or have no record yet).
How page text is written
Statuses come from official records through fixed rules in our code. Artificial intelligence never decides a status.
AI helps word the descriptions, quick answers and questions and answers on each page, using only that page's verified facts. Every page's text is checked automatically against its fact sheet, and then a person reviews it before it's published. Answers that rest on a record name their source.
Sponsored placements and listing order
Firms can pay for a placement. Paid placements are always labeled “Sponsored” and shown in their own group.
Paying never changes the organic list. On a building page it's ordered by: firms linked to that building by a permit or report first, then an active license, then verified project history at nearby condominiums, then distance. Services marked “Provider-stated” are the firm's own claims. Building pages show no Google ratings or reviews; a claimed engineer, architect or contractor may show its Google reviews on its own profile.
The law
Milestone inspection steps follow Florida Statutes §553.899 (2025), last checked September 22, 2026. Structural Integrity Reserve Study rules are in Florida Statutes §718.112.
Disclaimer
Compiled from public records; not legal or engineering advice.
Records can be late, incomplete or wrong at the source. Before you buy, sell, lend or make a repair decision, confirm with the association and the local building department.
Report an error
On a building page, use “Report an error” at the bottom of the page. For a building we don't cover yet, or anything else, use this form. A link to the public record that shows the correct information helps us fix it faster.